   Electric implementation works of Chipita Croissant Production Plant in Gebze Plastic Manufacturers Organized Industrial Zone (GEPOSB), with the employer being Chipita Gıda Üretim A.Ş., Main Contractor being Tek Yapı İnşaat ve Ticaret A.Ş., Controller being Whitestone S.A. are performed by us. The plant is installed on 6,600 m2 space in total. Consisting particularly of production area, storerooms and offices, the plant’s installed power is 2,000 kVa.
Systems implemented in the building: LV Power Transmission line, power distribution center, power generator installation, power installation, 60 Hz. Special device installation, interior and exterior illumination, fire detection system, emergency announcement system, structural wiring, lightning protection and main grounding system.