PLATİN KİMYA YÖNETİM BİNASI MASLAK / İSTANBUL

The 250 square meters administration office of Platin Chemicals is located at Polaris Plaza, Maslak. Special lighting design and weak current systems have been installed. Electrical project and installation works are completed.

SARIOĞLU DENİZCİLİK ŞİŞLİ/ İSTANBUL

The administration office of Sarioglu Marine Co. is on the 10th floor of Akm Plaza in Sisti, and it is built on 600rri of dosed area. Electrical power distribution and weak current systems have been installed. Electrical project and installation works are completed.

BIÇAKÇILAR YÖNETİM OFİSİ MEMORİAL CENTER- OKMEYDANI / İSTANBUL

Bıçakçılar is a two floored administration office with 1.200 square meters of closed area inside of Memorial Business Center. Electrical project and installation works are completed.

CENTRAL CAR YÖNETİM OFİSİ MASLAK / İSTANBUL

The 350square meters administration office of Central Car is located on Giz Plaza, Maslak. Special lighting design and weak current systems have been installed. Electrical project and installation works are completed.

HASBRO / İNTERTOY YÖNETİM OFİSİ İDE İŞ MERKEZİ KEMERBURGAZ / İSTANBUL

Hasbro-lntertoy is an administration office with 900 square meters of closed area inside of ide Business Center. There have been infrastructural cabling application and special lighting solutions in this office. Electrical project and installation works are completed. In addition, weak current systems have been installed.

SÜREÇ FiLMCİLİK MASLAK / İSTANBUL

The administration office of Surec Filmcilik Productions is on the 4th floor of Maslak Ayazaga Trade Centre. Special lighting system has been designed and installed. Electrical installation works are completed. Also, weak current systems have been installed.

ÇALIK HOLDİNG YENİYÖNETİM BİNASI ZİNCİRLİKUYU / İSTANBUL

Calik Holding administration building has 16.000 square meters of closed area. Electrical power distribution and weak current systems, electrical project and installation woks are completed.

AVEA YÖNETİM BİNASI GÜNEŞLi / İSTANBUL

Avea Gunesli central building consists of eight floors, and is built on an area of 15.000 square meters. The renovations done in the building include the electric system, mechanical automation systems, and weak current systems. Electrical project and installation works are completed.

YAMATA YATIRIM A.Ş. YÖNETİM BİNASI KAVACIK / İSTANBUL

Yamata Construction main office building is built on 2.100 square meters of closed area in Kavacik. Weak current systems have been installed. Electrical project and installation works are completed.

MERCK SHARP & DOHME iLAÇLARI YÖNETİM BİNASI İSTİNYE / İSTANBUL

The head office of Merck Sharp & Dohme Medicals consists of 3 block buildings on a closed area of 16.000 rd. The medium voltage and transformer center and generator system of 1000 kV A. energy automation, ughtning protection and earthing systems, and weak current system have been installed in the building. As an intelligent building it has been designed in order to get most energy savings by controlling the light due to the daylight. Electrical project and installation works are completed.

TURKON YÖNETİM BİNASI ALTUNİZADE / İSTANBUL

Turkon administration building has a closed area of 4.500 square meters, founded on 6 floors. Medium voltage switchgears and transformer center, diesel generator set and UPS system and power distribuiton are installed. Also, mechanical automation system, earthing and lighting protection systems, and weak current systems have been installed. Electrical project and installation works are completed.

AK YATIRIM MENKUL DEĞERLER A.Ş. GÜMÜŞSUYU / İSTANBUL

The head office building of AK Menkul Degerler AS. is built on 8.000 square meters of closed area, and consists of 8 floors. The energy distributions of 700 kVA main power, 500 kVA radiator cooled generator power, 500 kVA remote cooled generator power, and 200 kVA UPS power have been installed in the building. Also, lighting management system, mechanical automation system, and weak current system have been installed. Electrical installation works are comoleted.

AKBANK C BLOK OPERASYON MERKEZİ MASLAK / İSTANBUL

Akbank Operation Centre I C Block, consists of 27 floors on an approximately 22.000 square meters area. Architecturally it consists; -1st to -4th floors are technical spaces and archives, the ground floor is lobby and offices, 1st to 19th floors are offices, 20th floor is VIP Lounge, and 21st and 22nd floors are technical spaces. Electrical installation works are completed. Weak current systems have been installed.

LİNK BİLGİSAYAR GENEL MÜDÜRLÜK BİNASI ÇAMLICA / İSTANBUL

The head office of Link Bilgisayar in Caml!ca has 4.000 rri of closed area. Special lighting designs and installations have been made throughout the building. Electrical project and installation works are completed. Also weak current systems have been installed.

GÜN AVUKATLIK YÖNETİM BİNASI ZİNCİRLİKUYU / İSTANBUL

Gun Avukatl!k administration building has 2.000 square meters of closed area. It consists of 4 architectural parts, including offices, library, archive, and technichal area, and all electrical projects and installations are completed in the building. Electrical power distribution and weak current systems have been installed.

YKM YÖNETİM BİNASI 4.LEVENT / İSTANBUL

Yeni Karamursel administration building has a 4.500 square meters of closed area in 4th Levent. Its infrastructure is formed by under floor cable trays and parapet channels. ALL data, telephone, UPS, and main voltage energies are connected to sockets from this infrastructure. Electrical project and installation works are completed.

PERİKALIP iSKELE YÖNETİM BİNASI HADIMKÖY / İSTANBUL

Peri Kaltp production and administration building office has 500 square meters of closed area. ALL power and weak current systems have been installed. Electrical installation works are completed.

ÖZER İNŞAAT YÖNETİM BİNASI ULUS / İSTANBUL

Ozer insaat main office building has a BOO square meters of closed area with 2 basement floors, and a ground floor, 2 upper floors, and a roof floor. Electrical project and installations are completed.

STANDART PROFİL YÖNETİM BİNASI / DÜZCE

Standart Profil administration building has a 2.000 square meters of closed area inside of production departments. It has a main entrance and also a mould working area in the ground floor. The structure has special lighting designs in it. Weak current sytems have been installed. Electrical project and installation are completed.

COCA COLA A.Ş. DEPO VE SATIŞ OFİSİ DUDULLU / İSTANBUL

Coca Cola Dudullu building has been built as a warehousing and administration center on 20.000 square meters of closed area. A 1.600 kVA transfromer and a generator which spare the full charge have been used. Electrical project and installations have been completed. Weak current systems are installed.

COCA COLA A.Ş. TESİSLERİ ÖZDAĞ IŞIKKENT / İZMİR

Coca Cola fs1kkent-izmir sales and warehouse building is built on 16.000 square meters of closed area. The building which has a 1.000 kVA transformer and a generator is designed with type tested medium voltage enclosed units and panel boards. The building has been designed with specialligting. In addition, fiber optic application and weak current system have been installed. Electrical project and installations have been completed.

VİSTA PLAZA BİNASI KARAKÖY / İSTANBUL

The Business Center of Vista A.$. has 7.000 square meters of closed area and consists of 8 floors. The basement floor consists of a garage, and shelter and serves as a mechanical and electrical fadlities center. Distributions of diesel generator set and UPS have been installed. Electrical projects and installations have been completed. In addition, electrical power distribution, weak current, and lighting automation systems have been installed.

TAYTEKS GENEL MÜDÜRLÜK BİNASI MERTER / İSTANBUL

Tayteks main office building is built in Merter on 4.500 square meters of closed area. This building is a construction that integrated with both special architectural and electrical solutions. Electrical project and installations have been completed. In addition, weak current systems have been installed.

İSTİKBAL BÖLGE MÜDÜRLÜK BİNASI İKİTELLİ / İSTANBUL

The warehouse and administration building of İstikbal and Bellona companies in İkitelli have 20.000 m2 of closed area.It has been found as a suitable solution for constructing buildings by designing luminaire details in cassetle ceiling in warehouses.Electrical Project and installation have been completed.In addition , weak current systems have been installed.

İSTİKBAL BÖLGE MÜDÜRLÜK BİNASI KARTAL / İSTANBUL

The warehouse and administration building of istikbal and Bellona companies has 23.000 square meters of closed area in Kartal. Electrical projects and installations have been completed.

ANADOLU FİNANS YÖNETİM BİNASI KARTAL / İSTANBUL

Anadolu Finans main office building has 5.000 square meters of dosed area.lt consists of 10 floors induding basement, ground floor, and upper floors. All electrical projects and installations have been completed, and 35 types of special lighting fixtures from 8 different lighting companies are used in this building. In addition, weak current systems have been installed.