Social Structures

» Social Structures
GALATASARAK KÜREK TESİSLERİ – KANARYA / İSTANBUL

We have been the sponsor for the modern plannig, equipments and installation of The Oar Foundation of Galatasaray which is one of the precious clubs of Turkey. And the same club's football field, Ali Sami Yen's floodlights' angle adjustments have been done according to lighting calculations results. Its maintenance and administrating have been undertaken by our company. Because the field was old, the double bara system that should have become in its panel boards have been done by modifications. Also, the 1905 Galatasaray Young Business Men Association Center of the club has been planned and installed. Electrical project and installation works are completed.

MİMAR SİNAN ÜNİVERSİTESİ GÜZEL SANATLAR FAKÜLTESİ – BOMONTİ / ŞİŞLİ

Mimar Sinan University Faculty of Fine Arts in Bomonti Campus has 60.000 square meters area. In the project concept, medium voltage power line (34,5 kV), medium voltage switchgears and transformer centers 1×2000 kVA and 1x1600 kVA), distribution system d diesel generator set 1x1600 kVA ard 1x200kVA, eledrical. power distribution, ard weak current systems hale been install.ed. Electrical project and installation works are completed.

THE BRITIS COUNCIL – BEŞİKTAŞ / İSTANBUL

British Council is formed from dassrooms and place for cultural activities on 2.600 square meters of dosed area. The general and special lighting systems and weak current systems have been installed. Electrical project and installation works are completed.

MYDONOSE SHOWLAND YEŞiLKÖY / İSTANBUL

The building has 8.000 square meters ofclosed area with capacity of 5.000 people. One of the most important feature for all installation is being unraveled and it can be constructed to a new place quickly. That's why the electrical installation has also the flexibility which's suitable to this unraveling and reconstructing system. The total power of the building is provided by 2x1600 kVA power transformers. As the standby power there exists a 1600 kVA generator. The necessary maneuvers for the use of these sources have been done all automatically by energy management system. There have been used nearly 60 lighting fixtures of 10 different lighting companies, to get this lighting solution. There have been used 3 hour storage batteried emergency lighting fixtures to guide people to exits. All the lighting connections have been done by automation giving on-off-time conditions and scenario possibility. This automation gives automatically commanding possibility for both energy saving and putting away human mistaking factor. Electrical project and installation works are completed.