Ongoing Projects

» Ongoing Projects
COMMUNITY HEALTH CENTRE PROJECT ASHGABAT / TURKMENISTAN

The main contractor of the Community Health Center Project is Gap construction is located Ashgabat / Turkmenistan electrical Works are done by our company. The project is approximately established as a closed area of 17.000m2 over 37.500m2 open field. The Project includes High Voltage Power Distribution , earthing and lightning protection system, internal and external lighting systems, telephone and data systems, CCTV Systems, Security System, Time System has and Mechanical Automation Systems.

MORPHOLOGY HOSPITAL

The main contractor will be held in Ashgabat by Gap Construction building has 27,000 m2 of covered area.Medium voltage, low voltage and low current systems will be made by us Morphology Headquarters consists three parts; Department of Anatomy; There are only places of medical school students. Services and applications in the portion of the 1st floor, İn the 2nd floor there are classrooms, teachers and professors rooms, rooms for assistants, cadavers preparation rooms and technical rooms on the 3rd floor there are classrooms fo practice, teachers and professors rooms, resident rooms, cadaver preparation rooms, a museum, a library and administrative offices. Department -Patoloj; section is investigating the cause of death of people who murdered. Laboratory rooms in part of the 1st floor, x-ray analysis agreed rooms, morgues and funeral parlors with technical areas, İn the 2nd floor there are laboratory and physician rooms, conference rooms, classrooms; on the 3rd floor,there are teachers and professors rooms, resident rooms, a library and administrative and offices. Expertise (Forensic Medicine) Department; the corpses killed by homicide research section. Laboratory at the Department of the 1st floor, CT, funeral parlors, funeral wash rooms and technical areas, İn the 2nd floor there are laboratory and doctor's room, a conference room and administrative offices, classrooms on the 3rd floor there are teachers and professors rooms, a library, an internet cafe and administrative offices .

DANGEROUS INFECTIONS CENTER ASHGABAT / TURKMENISTAN

Turkmenistan investigate dangerous diseases within their borders and to take measures on the thought, which is considered the top-level health facility safety precautions. These infections of animals taken from the desert sand, earth, etc. In addition to animal food samples and samples taken from the human to be investigated in the laboratory and the necessary measures will be taken. Medium voltage, low voltage and low current systems. Will be applied to the project of 10,500 m2 closed area.

SETİF PARK MALL

Being constructed in Setif, Setif Park Mall Project is at a distance of 300 kilometers from Algeria, the capital city of Algeria, and the elevation form sea level is 1100 meters. A total of close area is 123.560 m² with 42.000 m² for five storey car park, 2100 m² for conference hall, 19.000 m2 for 17+2 storey hotel, 14.860 m² for 18+1 storey offices, 44.600 m2 for a shopping Center and hypermarket. Project is supplied by 11 transformers, a total of 7.440 kVA, and 2000 kVA is backed up by 5 generators.The building is cooled by 5 Chiller units and heated by 3 boiler units.

NAZARBAYEV UNIVERSITY 2.2 STAGE ASTANA / KAZAKİSTAN

Nazarbayev University 2.2 Stage which has 90.000Nazarbayev University 2.2 Stage which has 90.000m2 closed area, is proceeding in Astana. This stage has 5 blocks which 3 of them are Science Laboratories of the Nazarbayev University. Other blocks has 2 auditoriums which have 500 and 1600 people capacities and 2 ballrooms which have 250 m² people capacity. Also there are conference and symposium rooms in this block. Management offices and student’s club are located in the last block. closed area, is proceeding in Astana. This stage has 5 blocks which 3 of them are Science Laboratories of the Nazarbayev University. Other blocks has 2 auditoriums which have 500 and 1600 people capacities and 2 ballrooms which have 250 people capacity. Also there are conference and symposium rooms in this block. Management offices and student’s club are located in the last block.